The Assembly
Summary / Highlights / Sustainability / Plans
SIZE (SQFT)
/ 530,000
TYPE
/ GMP Advanced Manufacturing
(Labs & Offices),Public Realm & Retail
AVAILABILITY
/ 2025 Onwards
The Assembly
World-class GMP facilities in the heart of Stevenage’s vibrant town centre. The Assembly is one of a kind.
The Assembly is part of the largest knowledge cluster in the ‘Golden Triangle’, compromising 3.16 acres, and will offer a purpose-built home for pioneers and collaborators in the life science and technology sectors.
Expected to achieve BREEAM ‘Excellent’ standard, The Assembly has been designed with whole-life-cycle design principles from the outset and is raising the bar for sustainability in an advanced manufacturing facility.
Vibrant town centre location
5 minute walk from Stevenage train station
23 minutes by train to London Kings Cross
Phase 1 - 83,000 sq ft GMP facility on site and pre-let to Autolus.
Phase 2 - 450,000 sq ft GMP facility.
Shell & core or fully fitted options available
Volumetric construction for speedy delivery, halving construction time versus a conventional build
Achieving BREEAM Excellent and targeting Outstanding
Sustainability
At the centre of the design process
...support existing and future business in the town,...
The development bolsters the ongoing revitalisation of Stevenage town centre, with restaurant, retail and collaboration spaces at the ground floor level fronting onto a new public square. The introduction of commercial life science space will support existing and future business in the town, bringing footfall and expenditure through the addition of an estimated 1,850 high-value jobs.